Nan Gray Davis has water bottle filling stations located throughout campus. Students are encouraged to bring a refillable water bottle to campus each day. However, to protect all electronic and student devices, water bottles must have a screw-top lid and may not have a straw. Water bottles may only contain water; no other liquids may be inside students’ water bottles.
#BuildingBobcats
about 1 month ago, Nan Gray Davis Elementary School
MORNING CARLINE ARRIVAL
1. Students may not get out of the vehicle until the bell rings at 7:40 a.m.
2. Breakfast is “grab-and-go” style which ends at 8:05AM.
3. Car traffic should pull as far up as possible to avoid blocking traffic on Nan Gray Davis Road.
4. For safety purposes, students will exit the vehicle from the right side of the vehicle. Please make sure that your child is prepared to exit the vehicle on the right side.
Owners of the property surrounding the school do not authorize you to park and load/unload your children. In addition to being a safety hazard, these property owners may notify law enforcement to ensure that individuals do not illegally park on their property.
#BuildingBobcats
about 1 month ago, Nan Gray Davis Elementary School

AFTERNOON CARLINE DISMISSAL: We expect our students and parents to follow these procedures to ensure a safe and efficient dismissal each afternoon.
1. Follow the directions of the teachers conducting dismissal.
2. Individuals picking students up must have the official placard from the school, which can be obtaind during Meet the Teacher on Tuesday, August 4.
3. To avoid delaying traffic, parents must stay in the vehicle, with the engine off and the number displayed.
4. Children will remain in the cafeteria until the “safe to load” sign is held up.
5. No traffic will be allowed to move while “safe to load” is up.
6. A second signal will be given to indicate that loading is complete, car engines may be started, and all cars may exit.
Drivers who refuse to follow the established safety patterns and procedures may be restricted from driving on campus. Students will not be dismissed to parents who walk-up to the cafeteria door. No cell phone use, smoking, or loud music during dismissal.
#BuildingBobcats
about 1 month ago, Nan Gray Davis Elementary School
The Alabama FOCUS Act prohibits all public K-12 students from using cell phones, smartwatches, and other wireless communication devices during the instructional day. According to the act, devices must be powered off and stored out of sight using whatever method is set by the local school board.
Nan Gray Davis Elementary will utilize a cell phone lock box that will be stored in classrooms during the school day to comply with this state law. Cell phones will be collected from students each morning and returned to students immediately prior to dismissal each day. Appropriate disciplinary measures will be taken to address any student who refuses to follow this policy.
#BuildingBobcats
about 1 month ago, Nan Gray Davis Elementary School
For the 2026-2027 school year, clear backpacks will be required at all Mobile County Public System schools. MCPSS will NOT provide clear backpacks for students to utilize during the 2026-2027 school year. Parents are responsible for providing clear backpacks for their children. All content stored in any backpack utilized by any MCPSS student MUST be visible from all sides of the backpack. No stickers, markings, tint, or anything else should be placed on any backpack that prevents clear view of the contents.
You will be able to purchase a Secret Scientist brand clear backpack during Meet the Teacher on Tuesday, August 4, from 4PM to 6PM. If you have any questions regarding MCPSS's clear bookbag policy, please contact the front office at 251-221-1166 or email Dr. Agnew at
pjagnew@mcpss.com.
#BuildingBobcats
about 1 month ago, Nan Gray Davis Elementary School
Parents, over the next few days, we will be posting important information related to the start of the school year. Please pay attention to these updates. If you have any questions, please do not hesitate to contact the front office at 251-221-1166.
First, attached is our Uniform Policy for the 2026-2027 school year. No changes have been made to the uniform policy for the upcoming school year. Please note that it is MCPSS policy that students are not allowed to wear a hooded jacket or sweatshirt while at school.
#BuildingBobcats
about 2 months ago, Nan Gray Davis Elementary School
If you have not completed online registration for the 2026-2027 school year, please remember to do so as soon as possible! All students (new and returning) attending a MCPSS school must complete online registration at
www.mcpss.com. In addition, all students must submit two proofs of residence--either by uploading them to the registration portal or bringing them in to the front office during the indicated registration dates/times. Only those students who have completed registration and provided their proofs will be placed on a roll. Avoid the long line at Meet the Teacher on August 4 by making sure your child's registration is complete!
about 2 months ago, Nan Gray Davis Elementary School
As a reminder, all students attending Nan Gray Davis Elementary next year must be registered. Registration must be completed online at
www.mcpss.com. New proofs of residence are required for all new and returning students. Nan Gray Davis Elementary will be offering multiple registration dates at the school during the month of June. You may bring your proofs of residence during this time. Also, mark your calendar for our Meet the Teacher on Tuesday, August 4, from 4PM to 6PM!
#BuildingBobcats
about 2 months ago, Nan Gray Davis Elementary School
This Friday, May 22, is the last day of the 2025-2026 school year. Please make sure all library books are returned to school this week. Thank you all for a great school year! We hope everyone has a great summer break, and we look forward to seeing everyone again in August!
#BuildingBobcats
2 months ago, Nan Gray Davis Elementary School
Happy Speech-Language Pathologist Day to our incredible SLPs Mrs. Davis and Mrs. Roberts! These two professionals help our students find their voices, build confidence, and communicate with the world around them. Thank you for all you do!
2 months ago, Nan Gray Davis Elementary School
Here is the final parent newsletter of the 2025-2026 school year. A printed copy of this newsletter is coming home with students today. Thank you for another great year at Nan Gray Davis Elementary!
#BuildingBobcats
2 months ago, Nan Gray Davis Elementary School
Yesterday was our annual "Moving Up" Day at Nan Gray Davis. Students got an opportunity to spend some time with teachers from the next grade level so that they could experience what next year will be like. Students got to know their future teachers and learned the expectations of that grade level.
#BuildingBobcats
3 months ago, Nan Gray Davis Elementary School
Congratulations to our 10 students who performed well enough on the ACCESS test to exit the ESL program! Assessing domains such as speaking, listening, reading, and writing, the ACCESS assessment measures students' progress in learning the English language. We are extremely proud of these students' hard work and determination!
#BuildingBobcats #Perseverancepropelsprogress
3 months ago, Nan Gray Davis Elementary School
Here is the parent newsletter for the week of May 11 - 15, 2026. A printed copy of this newsletter is coming home with students today.
#BuildingBobcats
3 months ago, Nan Gray Davis Elementary School
Parents, we moved all students to the hallway when our school was under a tornado warning this morning. The students did a great job following directions and remaining quiet. The tornado warning has passed and all students are back in class at this time. We will continue to monitor the weather and react as needed. You can rest assured that your students are safe while at our school!
3 months ago, Nan Gray Davis Elementary School
Our school library will be closing this Friday, May 8, to complete the inventory for the end of the school year. We need all library books returned to the library by Friday. Parents, please have students check at home for any school library books.
#BuildingBobcats
3 months ago, Nan Gray Davis Elementary School
We welcomed back some of our former Jr. Bobcats who will be graduating high school this year. Our students and staff loved welcoming them back to campus to congratulate them and wish them well. Congratulations to the entire class of 2026!
#BuildingBobcats #Perseverancepropelsprogress
3 months ago, Nan Gray Davis Elementary School
Happy School Nurse Day to Nurse Lowry! Thank you for helping to keep our students healthy, safe, and ready to learn. From bandaging scraped knees to providing an encouraging word when we don't feel our best, your compassion and dedication make a difference every single day.
#BuildingBobcats
3 months ago, Nan Gray Davis Elementary School
Congratulations to our Kids with Character for the month of April! These students were selected by their teachers and peers for being great examples of the character trait PERSEVERANCE. We are proud of these Jr. Bobcats for being great role models for their classmates!
#BuildingBobcats #Perseverancepropelsprogress
3 months ago, Nan Gray Davis Elementary School
Here is the parent newsletter for the week of May 4 - 8, 2026. A printed copy of this newsletter is coming home with students today.
#BuildingBobcats
3 months ago, Nan Gray Davis Elementary School